Product Overview
High-speed EZO EOZ Easy-open-End (EOE) Making Production Line
202# 52mm/211# 65mm/300# 73mm/307# 83mm/401# 99mm
Name | Automatic Easy Open End (EOE) Making Line |
Model | 1#/2# |
Usage | It's used for punching basic lid of easy open end |
Nominal Pressure | 60T / 120T |
Slide Block Stroke | 105mm / 120mm |
Stroke | Max.200 strokes/min (Ø52-99mm); Max.150 strokes/min (Ø99-153mm) |
Max. Die Number on 60T | Max. 2-die (Ø52-99mm) & 1-die (Ø99-153mm) |
Max. Die Number on 120T | Max. 7-dies (Ø52-99mm) & 2-die (Ø99-153mm) |
Power | 25KW / 35KW |
Dimension | L4,500 x W2,800 x H3,000 (mm) / L5,500 x W3,200 x H3,200 (mm) |
Weight | 6.5T / 12T Approx. |
EOE Manufacturing Process
The EOE. Manufacturing process can be divided into two major steps. First, make the base end. Then, combine the end with the pull tab to form an EOE.
Base End Manufacturing Process:
1. Scroll Shearing/Slitting → Feeding → Base end making → Curling → Lining → Drying → Selection → Packing;
2. Base End and Pull Tab Combination Process:
Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;
3. Ring Pull Tab Manufacturing Process:
Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.
Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.
EOE Manufacturing Process
The EOE. Manufacturing process can be divided into two major steps. First, make the base end. Then, combine the end with the pull tab to form an EOE.
Base End Manufacturing Process:
1. Scroll Shearing/Slitting → Feeding → Base end making → Curling → Lining → Drying → Selection → Packing;
2. Base End and Pull Tab Combination Process:
Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;
3. Ring Pull Tab Manufacturing Process:
Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.
Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.
EOE Manufacturing Process
The EOE. Manufacturing process can be divided into two major steps. First, make the base end. Then, combine the end with the pull tab to form an EOE.
Base End Manufacturing Process:
1. Scroll Shearing/Slitting → Feeding → Base end making → Curling → Lining → Drying → Selection → Packing;
2. Base End and Pull Tab Combination Process:
Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;
3. Ring Pull Tab Manufacturing Process:
Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.
Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.
EOE Manufacturing Process
The EOE. Manufacturing process can be divided into two major steps. First, make the base end. Then, combine the end with the pull tab to form an EOE.
Base End Manufacturing Process:
1. Scroll Shearing/Slitting → Feeding → Base end making → Curling → Lining → Drying → Selection → Packing;
2. Base End and Pull Tab Combination Process:
Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;
3. Ring Pull Tab Manufacturing Process:
Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.
Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.
EOE Manufacturing Process
The EOE. Manufacturing process can be divided into two major steps. First, make the base end. Then, combine the end with the pull tab to form an EOE.
Base End Manufacturing Process:
1. Scroll Shearing/Slitting → Feeding → Base end making → Curling → Lining → Drying → Selection → Packing;
2. Base End and Pull Tab Combination Process:
Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;
3. Ring Pull Tab Manufacturing Process:
Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.
Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.