+
  • 209D 300epm 2outs AIDA Press Alu EOE Line(2).jpg
  • FA-209D-ALU-EOE(4).png

300epm 209D 2outs AIDA Conversion Press Alu. EOE Line

产品编号:

1051273035387854848

Operation:

Automatic

Can Size:

209D

Speed:

300epm

Line Dimension:

L55,000 x W8.500 x H3,500 (mm)

Line Weight:

51-Ton Approx.

keyword:

Aluminum FA EOE line

FA EOE

EOE LINE

easy-open end line

aluminum eoe line


Product Overview

209D Aluminum FA easy-open end line come with basic shell end line and conversion line
Message
Feature Workflow BOM Technical Parameter YouTube Video PDF Download

300epm 209D 2outs AIDA Conversion Press Alu. EOE Line

Input---Feeding---Pressing---Curling---Bagging---Lining---Testing---Drying---Feeding---Destacking---Pressing---Bagging---Output

 

EOE Manufacturing Process

The EOE. Manufacturing process can be divided into two major steps. First, make the base shell end (B/S). Then, combine the shell end with the pull tab to form an EOE.

Basic Shell End Manufacturing Process:

Scroll Shearing/Slitting → Feeding → Basic shell end making → Curling → Lining → Drying → Testing → Packaging;

Basic Shell End and Pull Tab Conversion Process:

Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;

Ring Pull Tab Manufacturing Process:

Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.

 

Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.

Input---Feeding---Pressing---Curling---Bagging---Lining---Testing---Drying---Feeding---Destacking---Pressing---Bagging---Output

 

EOE Manufacturing Process

The EOE. Manufacturing process can be divided into two major steps. First, make the base shell end (B/S). Then, combine the shell end with the pull tab to form an EOE.

Basic Shell End Manufacturing Process:

Scroll Shearing/Slitting → Feeding → Basic shell end making → Curling → Lining → Drying → Testing → Packaging;

Basic Shell End and Pull Tab Conversion Process:

Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;

Ring Pull Tab Manufacturing Process:

Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.

 

Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.

Input---Feeding---Pressing---Curling---Bagging---Lining---Testing---Drying---Feeding---Destacking---Pressing---Bagging---Output

 

EOE Manufacturing Process

The EOE. Manufacturing process can be divided into two major steps. First, make the base shell end (B/S). Then, combine the shell end with the pull tab to form an EOE.

Basic Shell End Manufacturing Process:

Scroll Shearing/Slitting → Feeding → Basic shell end making → Curling → Lining → Drying → Testing → Packaging;

Basic Shell End and Pull Tab Conversion Process:

Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;

Ring Pull Tab Manufacturing Process:

Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.

 

Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.

Input---Feeding---Pressing---Curling---Bagging---Lining---Testing---Drying---Feeding---Destacking---Pressing---Bagging---Output

 

EOE Manufacturing Process

The EOE. Manufacturing process can be divided into two major steps. First, make the base shell end (B/S). Then, combine the shell end with the pull tab to form an EOE.

Basic Shell End Manufacturing Process:

Scroll Shearing/Slitting → Feeding → Basic shell end making → Curling → Lining → Drying → Testing → Packaging;

Basic Shell End and Pull Tab Conversion Process:

Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;

Ring Pull Tab Manufacturing Process:

Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.

 

Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.

Input---Feeding---Pressing---Curling---Bagging---Lining---Testing---Drying---Feeding---Destacking---Pressing---Bagging---Output

 

EOE Manufacturing Process

The EOE. Manufacturing process can be divided into two major steps. First, make the base shell end (B/S). Then, combine the shell end with the pull tab to form an EOE.

Basic Shell End Manufacturing Process:

Scroll Shearing/Slitting → Feeding → Basic shell end making → Curling → Lining → Drying → Testing → Packaging;

Basic Shell End and Pull Tab Conversion Process:

Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;

Ring Pull Tab Manufacturing Process:

Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.

 

Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.

Send