Product Overview
1,600epm D73/83/99mm Tinplate Easy-open End Line
EOE Manufacturing Process
The EOE. Manufacturing process can be divided into two major steps. First, make the base shell end (B/S). Then, combine the shell end with the pull tab to form an EOE.
Basic Shell End Manufacturing Process:
Scroll Shearing/Slitting → Feeding → Basic shell end making → Curling → Lining → Drying → Testing → Packaging;
Basic Shell End and Pull Tab Conversion Process:
Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;
Ring Pull Tab Manufacturing Process:
Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.
Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.
EOE Manufacturing Process
The EOE. Manufacturing process can be divided into two major steps. First, make the base shell end (B/S). Then, combine the shell end with the pull tab to form an EOE.
Basic Shell End Manufacturing Process:
Scroll Shearing/Slitting → Feeding → Basic shell end making → Curling → Lining → Drying → Testing → Packaging;
Basic Shell End and Pull Tab Conversion Process:
Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;
Ring Pull Tab Manufacturing Process:
Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.
Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.
EOE Manufacturing Process
The EOE. Manufacturing process can be divided into two major steps. First, make the base shell end (B/S). Then, combine the shell end with the pull tab to form an EOE.
Basic Shell End Manufacturing Process:
Scroll Shearing/Slitting → Feeding → Basic shell end making → Curling → Lining → Drying → Testing → Packaging;
Basic Shell End and Pull Tab Conversion Process:
Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;
Ring Pull Tab Manufacturing Process:
Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.
Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.
EOE Manufacturing Process
The EOE. Manufacturing process can be divided into two major steps. First, make the base shell end (B/S). Then, combine the shell end with the pull tab to form an EOE.
Basic Shell End Manufacturing Process:
Scroll Shearing/Slitting → Feeding → Basic shell end making → Curling → Lining → Drying → Testing → Packaging;
Basic Shell End and Pull Tab Conversion Process:
Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;
Ring Pull Tab Manufacturing Process:
Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.
Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.
EOE Manufacturing Process
The EOE. Manufacturing process can be divided into two major steps. First, make the base shell end (B/S). Then, combine the shell end with the pull tab to form an EOE.
Basic Shell End Manufacturing Process:
Scroll Shearing/Slitting → Feeding → Basic shell end making → Curling → Lining → Drying → Testing → Packaging;
Basic Shell End and Pull Tab Conversion Process:
Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;
Ring Pull Tab Manufacturing Process:
Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.
Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.
EOE Manufacturing Process
The EOE. Manufacturing process can be divided into two major steps. First, make the base shell end (B/S). Then, combine the shell end with the pull tab to form an EOE.
Basic Shell End Manufacturing Process:
Scroll Shearing/Slitting → Feeding → Basic shell end making → Curling → Lining → Drying → Testing → Packaging;
Basic Shell End and Pull Tab Conversion Process:
Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;
Ring Pull Tab Manufacturing Process:
Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.
Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.