+
  • 1600epm 73mm tinplate eoe line(1).jpg
  • tinplate-eoe.jpg

1,600epm D73mm Tinplate EOE Line

产品编号:

1051273594866065408

Operation:

Automatic

Can Size:

D73/83/99mm

Speed:

1,600epm

Line Dimension:

Line Weight:

50-Ton Approx.

keyword:

tinplate eoe line

eoe conversion line

eoe making line

eoe production line

easy open end line

tin can end line


Product Overview

1,600epm D73mm Tinplate EOE Line
Message
Feature Workflow BOM Technical Parameter YouTube Video PDF Download

1,600epm D73mm Tinplate EOE Line

easy open ends

Name                        Automatic Easy Open End (EOE) Making Line
Model 1#/2#
Usage It's used for punching basic lid of easy open end
Nominal Pressure 60T / 120T
Slide Block Stroke 105mm / 120mm
Stroke

Max.200 strokes/min (Ø52-99mm);

Max.150 strokes/min (Ø99-153mm)

Max. Die Number on 60T Max. 2-die (Ø52-99mm) & 1-die (Ø99-153mm)
Max. Die Number on 120T Max. 7-dies (Ø52-99mm) & 2-die (Ø99-153mm)
Power 25KW / 35KW
Dimension

L4,500 x W2,800 x H3,000 (mm)

L5,500 x W3,200 x H3,200 (mm)

Weight 6.5T / 12T Approx.

 

easy open ends

EOE Manufacturing Process

The EOE. Manufacturing process can be divided into two major steps. First, make the base shell end (B/S). Then, combine the shell end with the pull tab to form an EOE.

Basic Shell End Manufacturing Process:

Scroll Shearing/Slitting → Feeding → Basic shell end making → Curling → Lining → Drying → Testing → Packaging;

Basic Shell End and Pull Tab Conversion Process:

Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;

Ring Pull Tab Manufacturing Process:

Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.

 

Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.

easy open ends

easy open ends

EOE Manufacturing Process

The EOE. Manufacturing process can be divided into two major steps. First, make the base shell end (B/S). Then, combine the shell end with the pull tab to form an EOE.

Basic Shell End Manufacturing Process:

Scroll Shearing/Slitting → Feeding → Basic shell end making → Curling → Lining → Drying → Testing → Packaging;

Basic Shell End and Pull Tab Conversion Process:

Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;

Ring Pull Tab Manufacturing Process:

Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.

 

Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.

easy open ends

easy open ends

EOE Manufacturing Process

The EOE. Manufacturing process can be divided into two major steps. First, make the base shell end (B/S). Then, combine the shell end with the pull tab to form an EOE.

Basic Shell End Manufacturing Process:

Scroll Shearing/Slitting → Feeding → Basic shell end making → Curling → Lining → Drying → Testing → Packaging;

Basic Shell End and Pull Tab Conversion Process:

Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;

Ring Pull Tab Manufacturing Process:

Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.

 

Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.

easy open ends

easy open ends

EOE Manufacturing Process

The EOE. Manufacturing process can be divided into two major steps. First, make the base shell end (B/S). Then, combine the shell end with the pull tab to form an EOE.

Basic Shell End Manufacturing Process:

Scroll Shearing/Slitting → Feeding → Basic shell end making → Curling → Lining → Drying → Testing → Packaging;

Basic Shell End and Pull Tab Conversion Process:

Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;

Ring Pull Tab Manufacturing Process:

Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.

 

Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.

easy open ends

easy open ends

EOE Manufacturing Process

The EOE. Manufacturing process can be divided into two major steps. First, make the base shell end (B/S). Then, combine the shell end with the pull tab to form an EOE.

Basic Shell End Manufacturing Process:

Scroll Shearing/Slitting → Feeding → Basic shell end making → Curling → Lining → Drying → Testing → Packaging;

Basic Shell End and Pull Tab Conversion Process:

Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;

Ring Pull Tab Manufacturing Process:

Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.

 

Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.

easy open ends

Send