+
  • 209D-Aluminum-EOE-line-with-speed-300epm-jeitco.jpg
  • FA-209D-ALU-EOE(1).png

300epm 209D FA Aluminum Easy-end End Line

产品编号:

1051272740918353920

Operation:

Automatic

Can Size:

209D

Speed:

300epm

Line Dimension:

Line Weight:

45-Ton Approx.

keyword:

eoe line

food can line

can end line

tin can making machine


Product Overview

209D FAE Line with capacity 300epm;
Message
Feature Workflow BOM Technical Parameter YouTube Video PDF Download

300epm 209D FA Aluminum Easy-end End Line

eoe line layout

Input---Feeding---Pressing---Curling---Bagging---Lining---Testing---Drying---Feeding---Destacking---Pressing---Bagging---Output

EOE Manufacturing Process

The EOE. Manufacturing process can be divided into two major steps. First, make the base shell end (B/S). Then, combine the shell end with the pull tab to form an EOE.

Basic Shell End Manufacturing Process:

Scroll Shearing/Slitting → Feeding → Basic shell end making → Curling → Lining → Drying → Testing → Packaging;

Basic Shell End and Pull Tab Conversion Process:

Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;

Ring Pull Tab Manufacturing Process:

Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.

 

Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.

Input---Feeding---Pressing---Curling---Bagging---Lining---Testing---Drying---Feeding---Destacking---Pressing---Bagging---Output

EOE Manufacturing Process

The EOE. Manufacturing process can be divided into two major steps. First, make the base shell end (B/S). Then, combine the shell end with the pull tab to form an EOE.

Basic Shell End Manufacturing Process:

Scroll Shearing/Slitting → Feeding → Basic shell end making → Curling → Lining → Drying → Testing → Packaging;

Basic Shell End and Pull Tab Conversion Process:

Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;

Ring Pull Tab Manufacturing Process:

Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.

 

Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.

Input---Feeding---Pressing---Curling---Bagging---Lining---Testing---Drying---Feeding---Destacking---Pressing---Bagging---Output

EOE Manufacturing Process

The EOE. Manufacturing process can be divided into two major steps. First, make the base shell end (B/S). Then, combine the shell end with the pull tab to form an EOE.

Basic Shell End Manufacturing Process:

Scroll Shearing/Slitting → Feeding → Basic shell end making → Curling → Lining → Drying → Testing → Packaging;

Basic Shell End and Pull Tab Conversion Process:

Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;

Ring Pull Tab Manufacturing Process:

Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.

 

Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.

Input---Feeding---Pressing---Curling---Bagging---Lining---Testing---Drying---Feeding---Destacking---Pressing---Bagging---Output

EOE Manufacturing Process

The EOE. Manufacturing process can be divided into two major steps. First, make the base shell end (B/S). Then, combine the shell end with the pull tab to form an EOE.

Basic Shell End Manufacturing Process:

Scroll Shearing/Slitting → Feeding → Basic shell end making → Curling → Lining → Drying → Testing → Packaging;

Basic Shell End and Pull Tab Conversion Process:

Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;

Ring Pull Tab Manufacturing Process:

Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.

 

Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.

Input---Feeding---Pressing---Curling---Bagging---Lining---Testing---Drying---Feeding---Destacking---Pressing---Bagging---Output

EOE Manufacturing Process

The EOE. Manufacturing process can be divided into two major steps. First, make the base shell end (B/S). Then, combine the shell end with the pull tab to form an EOE.

Basic Shell End Manufacturing Process:

Scroll Shearing/Slitting → Feeding → Basic shell end making → Curling → Lining → Drying → Testing → Packaging;

Basic Shell End and Pull Tab Conversion Process:

Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;

Ring Pull Tab Manufacturing Process:

Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.

 

Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.

Input---Feeding---Pressing---Curling---Bagging---Lining---Testing---Drying---Feeding---Destacking---Pressing---Bagging---Output

EOE Manufacturing Process

The EOE. Manufacturing process can be divided into two major steps. First, make the base shell end (B/S). Then, combine the shell end with the pull tab to form an EOE.

Basic Shell End Manufacturing Process:

Scroll Shearing/Slitting → Feeding → Basic shell end making → Curling → Lining → Drying → Testing → Packaging;

Basic Shell End and Pull Tab Conversion Process:

Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;

Ring Pull Tab Manufacturing Process:

Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.

 

Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.

Input---Feeding---Pressing---Curling---Bagging---Lining---Testing---Drying---Feeding---Destacking---Pressing---Bagging---Output

EOE Manufacturing Process

The EOE. Manufacturing process can be divided into two major steps. First, make the base shell end (B/S). Then, combine the shell end with the pull tab to form an EOE.

Basic Shell End Manufacturing Process:

Scroll Shearing/Slitting → Feeding → Basic shell end making → Curling → Lining → Drying → Testing → Packaging;

Basic Shell End and Pull Tab Conversion Process:

Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;

Ring Pull Tab Manufacturing Process:

Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.

 

Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.

Input---Feeding---Pressing---Curling---Bagging---Lining---Testing---Drying---Feeding---Destacking---Pressing---Bagging---Output

EOE Manufacturing Process

The EOE. Manufacturing process can be divided into two major steps. First, make the base shell end (B/S). Then, combine the shell end with the pull tab to form an EOE.

Basic Shell End Manufacturing Process:

Scroll Shearing/Slitting → Feeding → Basic shell end making → Curling → Lining → Drying → Testing → Packaging;

Basic Shell End and Pull Tab Conversion Process:

Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;

Ring Pull Tab Manufacturing Process:

Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.

 

Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.

Input---Feeding---Pressing---Curling---Bagging---Lining---Testing---Drying---Feeding---Destacking---Pressing---Bagging---Output

EOE Manufacturing Process

The EOE. Manufacturing process can be divided into two major steps. First, make the base shell end (B/S). Then, combine the shell end with the pull tab to form an EOE.

Basic Shell End Manufacturing Process:

Scroll Shearing/Slitting → Feeding → Basic shell end making → Curling → Lining → Drying → Testing → Packaging;

Basic Shell End and Pull Tab Conversion Process:

Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;

Ring Pull Tab Manufacturing Process:

Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.

 

Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.

Input---Feeding---Pressing---Curling---Bagging---Lining---Testing---Drying---Feeding---Destacking---Pressing---Bagging---Output

EOE Manufacturing Process

The EOE. Manufacturing process can be divided into two major steps. First, make the base shell end (B/S). Then, combine the shell end with the pull tab to form an EOE.

Basic Shell End Manufacturing Process:

Scroll Shearing/Slitting → Feeding → Basic shell end making → Curling → Lining → Drying → Testing → Packaging;

Basic Shell End and Pull Tab Conversion Process:

Bubbling → Sizing → Rivet → Ridge → Groove → Connection → Die → End top shaping → Online photodetection → Package counting;

Ring Pull Tab Manufacturing Process:

Punching, guide hole → countersink, punching → punching countersink → vacancy → Ring pull cutting → Pre-rolling → Vacancy → Forming → 90degree bending → Vacancy → Rivet Punching → Vacancy → Curling → Rivet Punching and Sizing.

 

Quality control is in accordance with the requirements of the process drawing: Check ring pull tabs for dimensions and shape each step of the production process, and pay attention to the condition and overall operation of guide pins.

We value your advice and advice.
If you have any questions about our products and services, please fill in the form below and we will contact you as soon as possible.

Send